A new asphalt surface for worn lots whose base still holds.
📞 Call (786) 321-8089 Request a Free Estimate
Property managers for retail plazas, office parks, warehouses and HOAs turn to parking lot resurfacing when a lot's surface has worn out but its base still carries traffic. A parking lot overlay is the usual answer: we prep the old pavement, bond new hot mix asphalt to it and finish the edges at curbs and doors, part of our parking lot paving and resurfacing across South Florida. Call (786) 321-8089 for a free on-site assessment that checks whether your lot qualifies.
A sound base. If the cracks are separate lines rather than a connected web, old patches have held, nothing ruts under a loaded truck and water drains, the base can carry a new surface. Lots built on a proper limerock base 10 to 20 years ago often still qualify.
Commonly 1.5 to 2 inches of hot mix asphalt on a parking lot, placed over a tack coat that bonds it to the surface below. The thickness is set by the traffic and by the edges it has to meet, so truck lanes and dock approaches are checked separately from customer stalls.
An overlay adds a new layer on top of the existing surface; a mill and pave grinds off the top layer first and replaces it, keeping the same height. Many lots get both, with milling at curbs and doors and an overlay across the open middle.
These point to a worn surface over a base that still works, which is what an overlay fixes.
An overlay is only as good as the surface it bonds to, so most of the work happens before new asphalt arrives.
Suspect areas are checked for webbed cracking, ruts and flexing. Open cracks are cleaned and filled, and failed spots are cut out and rebuilt in depth.
Along curbs, doors and gutters the old surface is milled, commonly 1 to 2 inches, so the overlay meets them at the right height. Grates and manhole frames are raised to the new grade.
The surface is swept and dried, then sprayed with a tack coat so the new asphalt bonds instead of sliding.
A paver lays hot mix asphalt, commonly 1.5 to 2 inches thick, and rollers compact it while hot.
Once a section cools, cars can typically return the next day; trucks wait longer. A mid-size lot often takes 2 to 4 days, phased by section.
Asphalt stacked straight on top steals curb height, traps water at the gutter and leaves a lip at the door. Where the overlay meets a door, an apron or older pavement, we mill a vertical edge, called a butt joint, so the new layer ends flush instead of thinning out.
Customer parking commonly uses 2 to 3 inches of asphalt, while truck lanes and dock approaches commonly need 3 to 4 inches or more over a thicker base. Where the existing section falls short of that, the route is rebuilt and the overlay stays in the car areas.
Old cracks keep moving after they are covered. Heat swings and wheel loads work them open until a line appears in the new surface in the same place, which is called reflective cracking. Prep limits it:
When cracking covers most of the lot, a full parking lot repaving plan fits better than an overlay. To compare bids, see what an asphalt paving company in Miami should itemize in a quote.
An overlay usually costs less than rebuilding, but the prep varies from lot to lot:
Dollar figures are in the guide to what parking lot paving costs in Miami.
Intense UV and heat age the surface faster than the base, so many lots here turn gray and brittle while the limerock underneath is still sound. Those lots are strong overlay candidates.
Tack coat and hot mix need a dry surface, so in the summer storm season we pave early, in small sections. Low spots are checked first, since an overlay cannot drain a dip in the base.
Resurfacing that changes drainage often needs a permit, while an overlay that keeps the existing grades may not; your city or county building department has the final word. See the paving FAQ, overlays in Miami-Dade County and overlays in Broward County.
Call (786) 321-8089 or use the form to tell us the lot size and what the surface looks like. We book a free on-site assessment, run the base check and send an itemized overlay quote.